SmileCare Dental

Smile Care is a 5,101 square foot interior and exterior remodel with a new parking lot and landscaping, as well as additional rental space. The goal was to keep the dental office operational throughout the entire process, so we completed the interior remodel in 2 phases. The interior remodel project consisted of a new layout, dental equipment, and implementing an all-around welcoming space. The exterior remodel consisted of new windows, siding, paint, building signage, landscaping and a new parking lot. 

Bremer Bank

The Bremer Bank located on the highly visible 45th Street in Fargo underwent a major remodel. Both first and second floors of the building were included.

The second floor was completely gutted and new walls were framed. First floor will have major demolition take place as well. The new remodel includes three openings cut in the 2nd floor with a glass railing and a new self-supporting steel staircase that will really modernize the look of Bremer Bank. The lobby is an open concept to better serve their customers. Offices, a breakroom, training rooms and more were included in the remodel.

United Way of Cass Clay

The United Way of Cass Clay will soon have a new home in Fargo. The construction of the building began this spring. The building will be a single story and around 8,000 square feet. There will be staff offices  and workstations, a training room and a volunteer activation center.

Roers is partnering with contractors from all over the community who are working together on this project for the United Way.

Three Affiliated Tribes (TAT) Project

The Three Affiliated Tribes Female Transitional Housing Project is a $5.5 million project and will begin October 2019. Phase I of the project will provide living space and continuum of care for clients who have completed the licensed substance abuse residential treatment project at the nearby Good Road Recovery Center and now are eligible for intensive outpatient step-down recovery treatment. The facility includes 18 2-bedroom apartments with living/dining and a bathroom, 4 2-bedroom family units, each with adult and children’s beds and two long-term efficiency apartments for live-in resident staff. The facility will hold 42 beds in total. The facility also includes a Recovery Support Child Care drop in day care center for up to six children for females with families. The center will double as an on-site tornado shelter also. The new facility is located on a 2.8 acre Greenfield site owned by the Three Affiliated Tribes in north Bismarck. The housing project will be fully owned and operated by the Three Affiliated Tribes.

Crossroads Dental

The dental office has a state-of-the-art sterilization center and a treatment conference room to provide a relaxed and private environment. The dental lab houses an in-house crown milling unit and 3-D printer. The office also has a full basement with a large training room which will provide area for staff training events, meetings and continuing education sessions.

West 45th Business Center

Large office building on the corner of Main Avenue and 45th Street South. Building has a variety of tenants, and has room for growth.

7th Ave Industrial Park

7th Avenue Industrial park was built to support the need of businesses that needed warehouse space along with attached offices. Each warehouse space has its own overhead door. Seen easily from Interstate I-29.

Time Square East

65,000 SQ FT Office/Retail center housing national tenants such as Applebees and AAA.

Sharehouse

Sharehouse provides chemical dependency services to men and women. This project consisted of an extensive two phase remodel and addition of the existing facility. Included remodel of all living units, addition of offices, the addition of a commercial kitchen and replacement of all windows. A third floor was added to the two story structure while it was occupied, requiring extensive coordination with the owner.

NDSU Football Facilities

NDSU Football Offices were commissioned to be built following NDSU’s move to Division I Athletics. This high level office space features cherry finishes with granite floors and countertops along with state of the art audio/video systems. The locker rooms were also built with high level finishes such as epoxy floors and high-tech training equipment.